ECB SREP 2026 Results: Stable 2027 Capital and RDARR Deadlines

RegReportingDesk card: ECB, European Central Bank, European Union

On 19 November 2026 the European Central Bank published the ECB SREP 2026 results alongside its supervisory priorities for 2027-29. The assessment covers 108 banks directly supervised by the ECB. On aggregate, overall CET1 capital requirements and guidance for 2027 come to 11.3% of risk-weighted assets, against 11.2% for 2026. The Pillar 2 requirement to be met with CET1 sits at 1.2%, up from 1.1%.

The headline is stability. The reporting work sits underneath it. This cycle was the first to use the ECB’s revised Pillar 2 methodology, and the published aggregate results show that the Pillar 2 requirement (P2R) changed for 61% of supervised entities, so the capital-requirement rows that prudential reporting teams load every quarter will move at many banks even though the system total barely did. The 2027-29 priorities also make risk data aggregation and risk reporting (RDARR) a deadline item: banks are expected to remedy material weaknesses within agreed deadlines, with enforcement measures if necessary, and the ECB lists recurring supervisory reporting issues among the persistent deficiencies.

The figures describe significant institutions under direct ECB supervision. Less significant institutions, supervised by their national authorities, sit outside this sample.

Related reading: ECB SREP 2026 Priorities: What Banks Should Prepare for in Liquidity and Prudential Reviews

ECB SREP 2026 results: the figures behind the 2027 decisions

The press release and the aggregated results report give the system-level capital stack for 2027. “Overall capital requirements and guidance” in the ECB’s notes means Pillar 1 plus P2R plus the combined buffer requirement plus Pillar 2 guidance (P2G), expressed as a share of risk-weighted assets, and the combined buffer estimates for 2027 reflect announced policy rates.

Aggregate measure (% of RWA) 2026 2027
Overall CET1 requirements and guidance 11.2% 11.3%
P2R to be met with CET1 1.1% 1.2%
P2G (non-binding) 1.1% 1.1%
Overall requirements and guidance, total capital 15.6% 15.7%
Total capital P2R around 2% around 2%

Source: ECB press release of 19 November 2026. The capital aggregates use a sample of 109 entities.

The rest of the outcome, in brief. The ECB applied binding leverage ratio Pillar 2 requirements to 14 banks and set non-binding leverage ratio Pillar 2 guidance for five. The average overall SREP score stayed at 2.5, and 86% of banks kept their 2025 score, with upgrades and downgrades mainly attributable to non-financial risks. New qualitative measures went to 78 banks, and their number fell by around 50% compared with the previous year; credit risk accounted for 33% of them, internal governance 24% and operational risk 12%. At the end of the second quarter of 2026 the weighted average total capital ratio was 20.1%, the fully phased-in leverage ratio 5.8%, the aggregate liquidity coverage ratio 155% and the average net stable funding ratio 125%.

Read the population counts before reusing any of these numbers in a board pack or a peer comparison. The ECB’s notes give four different figures: 110 supervised institutions as at September 2026, 107 banks that will receive either a SREP decision or a SREP operational letter, 108 banks in the score assessment and 109 entities behind the capital aggregates. Three banks will not receive a new SREP decision or operational letter this year because of ongoing mergers and acquisitions or their particular circumstances. The counts are consistent with each other; they simply measure different things, and a ratio built on one denominator does not transfer to another.

Dates on the 2027 prudential calendar

The calendar below distinguishes publication dates, regulatory application dates, supervisory remediation periods and planned assessment milestones.

Date What happens Source
19 November 2026 2026 SREP aggregated results and 2027-29 priorities published ECB press release
End of 2026 and 2027 A large number of severe RDARR supervisory measures due to be addressed ECB supervisory priorities 2027-29
1 January 2027 Capital requirements set in the 2026 SREP take effect. Revised EBA SREP Guidelines EBA/GL/2026/06 generally apply from 1 January 2027, replacing EBA/GL/2022/03 and EBA/GL/2017/05. Title 12 applies from 11 January 2027. The specified provisions concerning risks of non-implementation and evasion of targeted financial sanctions apply to those risks from 10 July 2027 ECB press release; EBA final report, June 2026
2027 Revised ECB liquidity and funding methodology applies; thematic review of prudential transition planning; EU-wide stress test with climate risks ECB Supervision Newsletter, 11 November 2026; ECB priorities
Summer 2027 Individual liquidity methodology results discussed in the supervisory dialogue ECB Supervision Newsletter
With the 2027 SREP results Further details of the revised liquidity methodology published ECB Supervision Newsletter
2028 Targeted on-site inspections of water-related risks ECB priorities

The revised P2R methodology: a flat average over moving parts

The ECB used its revised Pillar 2 methodology for the first time in this cycle to set the capital requirements effective from January 2027. According to the press release, it reduces complexity and creates a more direct link between capital requirements and risk drivers, and it left overall capital requirements at the system level unchanged while changing the requirements of individual banks.

The aggregated results report puts numbers on that. The P2R changed for 61% of supervised entities. For more than half of those banks it decreased, on average, by around 20 basis points; for the rest it increased by almost 20 basis points on average. A stable 1.2% system figure is fully compatible with a reporting team loading a P2R that has moved by a fifth of a percentage point in either direction.

The second moving part is the interaction with CRR III: Regulation (EU) 2024/1623, which amended the existing Capital Requirements Regulation (Regulation (EU) No 575/2013). The ECB reports noticeable increases in Pillar 1 requirements for around one-third of the entities it supervises, while around 60% saw their Pillar 1 requirements reduced. Where Pillar 1 requirements increased and overlaps with Pillar 2 were identified, the ECB reduced the P2R, by up to around 0.5 percentage point or less. The press release describes the CRR III effects so far as generally minor and different across banks, often lowering Pillar 1 requirements, and says the ECB will keep addressing potential double counting case by case as the new rules are phased in.

That case-by-case language matters for the reporting calendar. According to the EBA’s final report, the revised EBA SREP Guidelines, which generally apply from 1 January 2027, foresee that when a relevant change in the Pillar 1 framework has, or is expected to have, a material impact on an institution’s capital profile, competent authorities assess its interplay with the P2R, and that this may lead to a redetermination of the level or composition of the P2R within the annual SREP cycle or at an adjusted frequency. The guidelines also say the communication of the SREP outcome should include the date of application and the required level and quality of the P2R, with an institution-specific justification that gives a clear indication of the material risk drivers, set out separately for the risk of excessive leverage and for other risks. Our guide to the revised EBA SREP Guidelines covers the ICAAP and ILAAP side of that text.

My reading for reporting teams: the TSCR input is a value with an effective date attached, and nothing in the 2027 framework guarantees it changes only once a year.

Loading the 2027 decision into COREP C 03.00 and current resolution reporting

The SREP outcome reaches supervisory reporting through the memorandum items of COREP template C 03.00. The row numbers and definitions below follow the C 03.00 instructions in Commission Implementing Regulation (EU) 2021/451; its successor, Commission Implementing Regulation (EU) 2024/3117, has applied since 28 June 2025, so confirm each row reference against the C 03.00 instructions in Regulation (EU) 2024/3117, as amended, before mapping. Resolution planning reporting is governed by Commission Implementing Regulation (EU) 2025/2303. The SRB’s former LDR template was replaced by RESOL1/RESOL2 from the 31 December 2025 reference date.

For the 31 December 2026 reference date, the EBA’s reporting framework 4.4 (phase 1) includes technical corrections to the resolution-planning Data Point Model and XBRL taxonomy. Banks should therefore use the applicable framework 4.4 technical package rather than relying solely on the original framework 4.2 specifications. If the COREP framework is new to you, start there.

C 03.00 row What the row holds 2027 input
0130 TSCR ratio 8% total capital ratio plus the P2R, as communicated by the competent authority P2R from the SREP outcome
0140 TSCR: CET1 4.5% plus the part of the P2R required in CET1 At least 56.25% of the P2R, or more if required
0150 TSCR: Tier 1 6% plus the part of the P2R required in Tier 1 At least 75% of the P2R, or more if required
0160 to 0180 OCR TSCR plus the combined buffer requirement, to the extent legally applicable Buffer rates applicable at the reference date
0190 to 0210 OCR and P2G OCR plus P2G, included only if communicated P2G from the SREP outcome
0220 CET1 surplus or deficit Absolute CET1 surplus or deficit after meeting the applicable Article 92 CRR and Article 104a CRD requirements, including CET1 needed to satisfy Tier 1, total-capital or additional P2R requirements where available AT1 or Tier 2 capital is insufficient Own funds at the reference date

The composition percentages come from Article 104a(4) of the Capital Requirements Directive (Directive 2013/36/EU, as amended by Directive (EU) 2019/878): at least three quarters of the additional own funds requirement in Tier 1 capital, and at least three quarters of that Tier 1 in CET1, which is where 75% and 56.25% come from. The same paragraph lets the competent authority require a higher portion of Tier 1 or CET1 where necessary. The row 0140 instruction refers to the part of the P2R the competent authority requires in CET1, so a decision with a higher CET1 share changes that row, and copying 56.25% from last year’s spreadsheet would misstate it. For P2G, the revised EBA SREP Guidelines specify CET1 coverage, and Tier 1 for the leverage-based P2G.

The SRB publishes additional Level 3 data-quality checks for current resolution reporting and encourages institutions to reconcile resolution data with FINREP and COREP where applicable. The previous LDR tab T 02.00.a is no longer part of the reporting framework from the 31 December 2025 reference date. RESOL1/RESOL2 submissions use the templates, data point model and validation rules of Regulation (EU) 2025/2303.

The SRB strongly encourages reporting entities to perform the applicable Level 3 data-quality checks before submitting RESOL1/RESOL2 data to their national resolution authorities. The current checks, affected data points and applicable validation severity must be confirmed from the relevant reporting package.

Pillar 3 key metrics, the leverage stack and operational letters

Public disclosure picks up part of the same stack. Article 447(c) of the Capital Requirements Regulation requires institutions to disclose, where applicable, the amount and composition of the additional own funds they must hold under Article 104(1)(a) of the CRD, and the EBA’s mapping of the Pillar 3 implementing technical standards places Article 447, points (a) to (g), in template EU KM1. The P2G has no line in Article 447: in its current consolidated text the article lists own funds and risk-based capital ratios (with un-floored ratios where applicable), the total risk exposure amount, the P2R, the combined buffer requirement, the leverage ratio, LCR and NSFR figures, and the own funds and eligible liabilities ratios under Articles 92a and 92b. The P2G therefore lives in supervisory reporting through C 03.00 rows 0190 to 0210 and stays outside the mandatory key metrics.

The 14 banks with a binding leverage ratio P2R carry a separate stack, measured against the total exposure measure. Within that stack, Article 104a(4) CRD says own funds used to meet the leverage P2R cannot also be used for the 3% leverage ratio requirement in Article 92(1)(d) CRR, the G-SII leverage ratio buffer or the leverage-based P2G. The parallel rule for the risk-based P2R excludes the Pillar 1 capital ratios, the combined buffer requirement and the risk-based P2G.

Operational letters add an edge case. Since the 2025 SREP, the ECB’s published methodology allows the outcome to be communicated through an operational letter instead of a SREP decision under certain conditions, provided the joint supervisory team issues no new qualitative or quantitative requirements. In that case the previously issued requirements remain applicable unless they have been remediated. The press release confirms that the 107 banks in this cycle will receive one or the other.

RDARR moves from finding to deadline in the 2027-29 priorities

Internal governance is where the 2026 SREP found the most reporting-relevant weakness. The aggregated results report says governance scores were largely driven by risk data aggregation and risk reporting weaknesses, that most institutions still needed to fully comply with the Basel Committee’s BCBS 239 expectations, and that RDARR made up 27% of the internal governance measures. The press release names the same pattern from the other side: new qualitative measures targeted shortcomings in risk data aggregation and risk reporting, and weaknesses in data quality, IT architecture and an overreliance on manual processes continued to hamper effective risk management.

The priorities document turns that into a plan. Its strategic objective asks supervised entities to remedy material RDARR weaknesses effectively and promptly, in line with the ECB’s Guide on effective risk data aggregation and risk reporting and the BCBS 239 principles. The deficiencies it names are concrete: IT and data architectures, data lineage, data quality controls, excessive reliance on manual processes and recurring supervisory reporting issues.

A large number of severe RDARR supervisory measures are due to be addressed by the end of 2026 and in 2027, and the listed activities are a continuation of the remediation strategy on severe measures and targeted on-site inspections of RDARR frameworks at banks that need further assessment. The aggregated results confirm that the ECB Guide remains under revision. In its 26 June 2026 review of supervisory guidance, the ECB stated that the revised Guide is expected to be published in the fourth quarter of 2026.

A reporting team that treats RDARR as the risk function’s project about internal dashboards is reading the scope too narrowly. The ECB’s May 2024 Guide recommends that the scope of a bank’s data governance framework include, at a minimum, supervisory reports such as FINREP and COREP, the Short Term Exercise, submissions to EU-wide EBA and SREP stress tests, and Pillar 3 disclosures. It asks banks to identify the critical data elements behind their key risk indicators, meaning the elements used to calculate them that have a direct or significant impact on the value.

The same Guide records that, in the supervisory work leading up to it, production times of 40 or more working days were observed for monthly risk reports in many cases. The Guide states that it does not impose new requirements; the ECB uses BCBS 239 as its benchmark of best practice. Our BCBS 239 implementation article covers the principles themselves.

Put together, the reporting function is inside the remediation perimeter by the ECB’s own definition. A lineage or data-quality measure with an end-2026 or 2027 due date can land on the COREP and FINREP production chain even when the measure sits with the risk function.

CRR III, securitisation and NBFI reviews under the first priority

The first priority, financial resilience to geopolitical risks and macro-financial shocks, carries three strands with a direct line to prudential returns.

CRR III implementation. Supervisors will continue to assess whether CRR III has been accurately and consistently implemented, particularly the calculation of risk-weighted assets for credit and operational risk under the standardised approach. The listed activities are a targeted review of how credit risk-weighted assets are calculated under the standardised approach, complemented by an on-site inspection campaign, and a targeted review of the business indicator component that supports the calculation of operational risk capital requirements. Both calculations are the ones reported in the COREP credit risk and operational risk templates.

Significant risk transfer. Supervisors will review significant risk transfer securitisation strategies and how they are integrated into risk management and capital planning, with targeted on-site inspections on synthetic transactions. The ECB introduced a fast-track procedure in January 2026 for eligible simple and standardised synthetic securitisations, and reports that approximately 30% of all synthetic transactions meet the eligibility criteria.

Non-bank exposures. A new on-site inspection campaign covers fund financing, asset-based lending and exposures to non-bank financial institutions (NBFIs). The ECB says supervisory efforts will concentrate on institutions with significant exposures to riskier counterparties, so the campaign is aimed at those banks.

Climate and nature risks remain part of the same priority. A thematic review in 2027 will assess banks’ prudential transition planning in line with the CRR III and CRD VI package, the 2027 EU-wide stress test will incorporate climate-related transition and physical risks alongside macro-financial shocks, and targeted inspections of water-related risks are planned for 2028.

Liquidity scoring from 2027 runs on returns banks already file

The press release links to the liquidity methodology applicable from 2027, which the ECB described in its Supervision Newsletter of 11 November 2026. The revised methodology rests on three assessments: short-term liquidity risk, funding sustainability and risk controls. Findings from banks’ internal liquidity adequacy assessment process (ILAAP) reports now sit inside the risk controls assessment, the multi-year assessment flexibility extends to this part of the SREP, and an updated formula produces the automatic scores that supervisors then adjust with expert judgement.

For reporting teams the operative sentence is that the metrics rely largely on existing prudential reporting. The newsletter names the contractual schedule of liquidity inflows and outflows, funding concentration, asset encumbrance, liquidity and funding in foreign currencies, and banks’ funding plans. The 11 November 2026 ECB newsletter describes a methodology based largely on existing prudential reporting and does not announce a new reporting template.

Further details will be published on the ECB website with the 2027 SREP results, and individual results will be discussed during the supervisory dialogue in summer 2027. My working assumption is that errors in those existing submissions can now flow into a formula-driven starting score, which makes the liquidity data controls worth reviewing before 2027 data are used. Our article on the ECB SREP liquidity and funding methodology covers the newsletter in detail.

On methodology stability, the press release says no further changes to SREP methodologies are expected over the next two years and that future revisions will be less frequent than during the reform years. The newsletter adds that the overall SREP methodology will remain stable until 2030 and that supervisory manual updates will come only every three years.

ICT, DORA testing and AI under the second priority

Operational and ICT risk remained one of the weakest-scoring categories, with 92% of significant institutions revealing deficiencies in cybersecurity, third-party risk management and ICT risk controls. The aggregated results put the average ICT risk component score at 3.02, on a scale where 1 is best and 4 worst.

The second priority focuses on remediation of material deficiencies in ICT risk management. Planned activities include on-site inspection campaigns on cybersecurity management and third-party risk management, threat-led penetration testing in line with the Digital Operational Resilience Act (Regulation (EU) 2022/2554, with the testing rules in Commission Delegated Regulation (EU) 2025/1190), a targeted review of banks’ cloud service provider dependencies and a quantum computing readiness survey on post-quantum cryptography migration. Supervisors will also assess banks’ responses to AI-enabled cyber threats, engage with the industry on AI use cases, and inform relevant banks about risks identified by the Lead Overseer of critical ICT third-party providers.

The DORA reporting obligations a bank already runs, such as major ICT-related incident reporting under the templates in Commission Implementing Regulation (EU) 2025/302 and the register of information on ICT third-party arrangements, keep their existing legal basis. The listed activities add supervisory work on the controls behind them.

Frequently Asked Questions

Our bank received a SREP operational letter, not a SREP decision. Which P2R goes into C 03.00 for 2027?

The ECB’s methodology says that when the outcome is communicated through an operational letter, the previously issued requirements remain applicable unless they have been remediated. The TSCR row therefore continues to reflect the requirement from the last decision that set it. Confirm the position with the joint supervisory team if the letter is silent on capital.

A P2R applicable from 1 January 2027 was notified in December 2026. Which COREP reference date first shows it?

The C 03.00 instruction ties row 0130 to the TSCR “as communicated” and does not name a first reference date. Some national supervisors spell out a convention: the CSSF’s additional reporting guidance for credit institutions, for example, says a Pillar 2 add-on communicated by the end of year N and applicable from 1 January of year N+1 is reflected in the March COREP of year N+1. Where no convention is published, agree the treatment with the supervisor and document it.

Does a shortfall against P2G trigger the maximum distributable amount restrictions?

Article 104b(6) CRD says it does not, provided the institution meets the Pillar 1 own funds requirements, the P2R and, as relevant, the combined buffer requirement or the leverage ratio buffer requirement: failing to meet the guidance in that position does not trigger the Article 141 or 141b restrictions. The P2G is still reported in C 03.00 rows 0190 to 0210 when communicated.

Do these results apply to less significant institutions?

The 2026 SREP aggregate figures relate to banks directly supervised by the ECB and exclude less significant institutions (LSIs). LSIs undergo SREP under their national competent authorities. However, the ECB explains that its 2027-29 supervisory priorities may serve national supervisors as a reference when setting proportionate oversight strategies for LSIs. The revised EBA SREP Guidelines are a separate instrument addressed to the competent authorities of credit institutions and of certain investment firms, and they generally apply from 1 January 2027 whatever the supervisor.

Does an SRB Level 3 data-quality finding on a RESOL1 or RESOL2 return block submission?

The SRB applies additional Level 3 data-quality checks alongside other controls on resolution-reporting submissions and encourages banks to perform them before filing. Whether a particular finding prevents submission or requires follow-up must be assessed against the current validation rules and the national resolution authority’s submission arrangements.

Part of our P2R is a non-performing exposure add-on to be met fully in CET1. How does that change the C 03.00 composition rows?

The aggregated results report says five banks received NPE P2R add-ons in this cycle, ranging from 5 to 12 basis points, and that for some institutions with persistent coverage shortfalls the add-on was imposed fully in the form of CET1 capital. Article 104a(4) CRD allows a higher CET1 share, and row 0140 carries the part of the P2R the competent authority requires in CET1, so for such a bank the row sits above 4.5% plus 56.25% of the total P2R. Row 0150 needs the same check for the Tier 1 share.

Key Takeaways

  • Take the 2027 C 03.00 inputs from the institution’s own SREP decision or operational letter; the press release averages say nothing about any single bank’s TSCR.
  • Validate the applicable RESOL1/RESOL2 data against current EBA and SRB rules and reconcile them with COREP where required. The resolution returns due on 31 March and 30 April 2027 use the 31 December 2026 reference date; annual returns using 31 December 2027 data are due in 2028.
  • Build the TSCR process to accept a mid-year change with its own effective date, since CRR III overlaps are now addressed case by case.
  • Article 447 CRR puts the P2R amount and composition into public key metrics; P2G has no Article 447 line.
  • List every RDARR measure due at end-2026 or in 2027 that touches FINREP, COREP, stress-test or Pillar 3 production, and give each an owner in the reporting function.
  • Plan 2027 change capacity around RDARR remediation and CRR III review findings: the ECB expects no further SREP methodology changes over the next two years.

Sources and References

  • ECB Banking Supervision, press release, “ECB keeps capital requirements broadly stable for 2027, focuses its priorities on banks’ financial and operational resilience”, 19 November 2026: bankingsupervision.europa.eu
  • ECB Banking Supervision, “Aggregated results of the 2026 SREP”, November 2026: bankingsupervision.europa.eu
  • ECB Banking Supervision, “Supervisory priorities 2027-29”: bankingsupervision.europa.eu
  • ECB Supervision Newsletter, “A leaner methodology for banks’ liquidity and funding risks”, 11 November 2026: bankingsupervision.europa.eu
  • ECB Banking Supervision, “Supervisory methodology 2025” (SREP operational letters): bankingsupervision.europa.eu
  • ECB Banking Supervision, “Guide on effective risk data aggregation and risk reporting”, May 2024: PDF
  • Basel Committee on Banking Supervision, “Principles for effective risk data aggregation and risk reporting” (BCBS 239), 9 January 2013: bis.org
  • EBA, Final Report on revised Guidelines on common procedures and methodologies for SREP and supervisory stress testing, June 2026: PDF
  • Directive 2013/36/EU (Capital Requirements Directive), Articles 104, 104a and 104b: EUR-Lex
  • Directive (EU) 2019/878 (CRD V), inserting Articles 104a and 104b: EUR-Lex
  • Regulation (EU) No 575/2013 (Capital Requirements Regulation), Articles 92 and 447: EUR-Lex
  • Regulation (EU) 2024/1623 (CRR III): EUR-Lex
  • Commission Implementing Regulation (EU) 2021/451 (earlier supervisory reporting ITS, largely superseded by Regulation (EU) 2024/3117; limited transitional provisions remain applicable until 31 December 2026): EUR-Lex
  • Commission Implementing Regulation (EU) 2024/3117 (supervisory reporting ITS, applicable from 28 June 2025): EUR-Lex
  • EBA, overview of Pillar 3 templates and IT solutions (Article 447 CRR mapped to EU KM1), June 2026: XLSX
  • Single Resolution Board, 2026 resolution reporting (RESOL1/RESOL2 replacing the LDR): SRB
  • Commission Implementing Regulation (EU) 2025/2303 (resolution reporting ITS): EUR-Lex
  • EBA, reporting framework 4.4 (phase 1 technical package released 12 October 2026): EBA
  • ECB Banking Supervision, press release of 26 June 2026 on streamlining supervisory guidance: ECB
  • CSSF, “Additional guidance for credit institutions related to specific reporting aspects”, version 17.0 of 4 December 2025: PDF
  • Regulation (EU) 2022/2554 (Digital Operational Resilience Act): EUR-Lex
  • Commission Delegated Regulation (EU) 2025/1190 (threat-led penetration testing RTS): EUR-Lex
  • Commission Implementing Regulation (EU) 2025/302 (major ICT-related incident reporting templates): EUR-Lex

Before the first 2027 COREP reference date

The 2026 SREP leaves the system-level capital stack almost where it was, so the reporting risk sits in the bank-specific inputs and in the RDARR measures with near-term due dates. Before the first 2027 COREP reference date, obtain the applicable P2R, its CET1 and Tier 1 composition, and P2G from the effective SREP decision or from the previous decision retained under an operational letter. Maintain controlled inputs for C 03.00 and reconcile the applicable P2R disclosures with Pillar 3. Treat resolution reporting separately under the current RESOL1/RESOL2 framework, using the relevant reference dates and validation rules.

Disclaimer: The information on RegReportingDesk.com is for educational and informational purposes only. It does not constitute legal, regulatory, tax, or compliance advice. Always consult your compliance officer, legal counsel, or the relevant supervisory authority for guidance specific to your institution.

Similar Posts

  • BaFin and the MiCAR Perimeter: How Regulators Separate Tokenised Securities From Crypto-Assets

    Put a financial product on a blockchain and the hardest question is which rulebook the token sits under, not how the token works. Get the MiCAR perimeter wrong and a reporting team builds the wrong control set around the wrong instrument: white-paper notifications and crypto-asset service provider records where a prospectus, and potentially MiFID/MiFIR controls…

  • ECB ICAAP and ILAAP Package: What the 2026 Clarification Changes

    On 26 June 2026 the ECB announced a review of roughly 130 of its banking supervision publications, and in mid-July it followed through on the part that touches every capital and liquidity team: an updated ECB clarification on ICAAPs and ILAAPs and respective package submissions, alongside an updated version of the ECB Guide to the…

  • DORA Major Incident Reporting: The ESAs’ Filing Instructions

    On 16 September 2026 the three European Supervisory Authorities, the EBA, EIOPA and ESMA, published joint operational instructions for DORA major incident reporting. Short and technical, the document addresses something narrow and, for reporting teams, immediate: how selected fields of the major-incident template are expected or recommended to be populated, so that the data reaching…

  • CSSF Incident Handling Guidance: NIS2 Rulebooks and the DORA Clock

    On 28 September 2026 the CSSF published press release 26/19 announcing operational guidance for incident handling: nine rulebooks written jointly by cybersecurity experts from the High Commission for National Protection (HCPN, acting as ANSSI and as GOVCERT.LU), CIRCL, the CSSF and the ILR. The practical question for Luxembourg DORA entities is whether the CSSF incident…